All lead times listed below are estimates. We are a small shop and almost all barrels are made custom per order. We pride ourselves in our work and do our best to meet advertised lead times.
ALL IN-STOCK BARRELS (with the exception of the FN 5.7 barrel) are cut to length, crowned, threaded, made drop in or fitted, and finish applied custom per order. For this reason, the lead times listed below apply.
ITEMS LISTED AS ON BACKORDER: If a barrel is listed as “On Backorder”, we do not have any in inventory and are currently manufacturing another run of barrels. Barrels that are on backorder can be ordered and will be filled and shipped as soon as we are finished manufacturing. Once backordered barrels are back in stock, we begin filling and shipping orders by date placed (earliest to latest).
pvd/dlc coatings
PVD and DLC coatings add approximately 3-4 weeks to all barrel lead times listed below.
BARREL LEAD TIMES
1911 BARRELS:
- 9MM / .38 SUPER: 3-4 weeks
- .40S&W / 10MM: 3-4 weeks
- .45 ACP: 3-4 weeks
BERETTA 92/M9: 5 weeks
CZ 457 BARRELS: 3 weeks
FN 5.7 THREADED BARRELS: On Backorder. Back in stock January or February depending on heat treatment lead times.
GLOCK BARRELS:
- Glock 17: 4 weeks
- Glock 17L: 4 weeks
- Glock 19: 4 weeks
- Glock 19X: 4 weeks
- Glock 26: 4 weeks
- Glock 34: 4 weeks
- Glock 45: 4 weeks
HK BARRELS:
- VP9 / VP9L / VP9 Match: 5 weeks
- P30 / P30L: 5 weeks
- HK45: 5 weeks
- USP 9MM, USP Expert 9MM: 5 weeks
- USP 45, USP Expert 45: 5 weeks
REMINGTON 597 BARRELS: 3 weeks
TAURUS PT92 / PT99: 4 weeks
WALTHER BARRELS:
- P99: 5 weeks
- PPQ: 5 weeks
- PDP: 5 weeks
- Q5 Match: 5 weeks
- Q4 / Q5 Steel Frame: On backorder, back in stock in February
LEAD TIME FOR SERVICES & OTHER PRODUCTS
- BERETTA 92 FIBER OPTIC FRONT SIGHT INSTALL: 4-5 weeks
- BARREL THREADING: 3 weeks.
- PVD/DLC COATINGS (CUSTOMER PROVIDED PARTS): 4-5 weeks
- BERETTA 92 COMPENSATORS: 2-3 weeks
- BERETTA 92 COMPENSATOR INSTALLS (BARREL THREADING AND COMP FITTING): 3-4 weeks