LEAD TIMES

All lead times listed below are estimates. We are a small shop and almost all barrels are made custom per order. We pride ourselves in our work and do our best to meet advertised lead times.

ALL IN-STOCK BARRELS (with the exception of the FN 5.7 barrel) are cut to length, crowned, threaded, made drop in or fitted, and finish applied custom per order.  Barrels with no stock status listed are in stock and will ship after the order specific machining is finished. For this reason, the lead times listed below apply.

ITEMS LISTED AS ON BACKORDER:  If a barrel is listed as “On Backorder”, we do not have any in inventory and are currently manufacturing another run of barrels.  Barrels that are on backorder can be ordered and will be filled and shipped as soon as we are finished manufacturing.  Once backordered barrels are finished, we begin filling and shipping orders by date placed (earliest to latest).

pvd/dlc coatings

PVD and DLC coatings add approximately 3-4 weeks to ALL BARREL LEAD TIMES LISTED BELOW. These coatings are done by a third party vendor, so we DO NOT have control of PVD or DLC coating turnaround times.

BARREL LEAD TIMES

1911 BARRELS:

  • 9MM / .38 SUPER: 3-4 weeks
  • .40S&W / 10MM: 8 weeks
  • .45 ACP: 6 weeks

BERETTA 92/M9:  5 weeks

CZ 457 BARRELS:  4-5 weeks

FN 5.7 THREADED BARRELS:  In Stock

GLOCK BARRELS:

  • Glock 17: 5 weeks
  • Glock 17L: 5 weeks for Gen 1-3. Gen 5 On Backorder and estimated to resume shipping in July.
  • Glock 19: 5 weeks
  • Glock 19X: 5 weeks
  • Glock 26: 5 weeks
  • Glock 34: 5 weeks
  • Glock 45: 5 weeks

HK BARRELS:

  • VP9 / VP9L / VP9 Match: 5 weeks
  • P30 / P30L: 5 weeks
  • HK45: On Backorder. Estimated to be back in-stock in July.
  • USP 9MM, USP Expert 9MM: 5 weeks
  • USP 45, USP Expert 45: 5 weeks

REMINGTON 597 BARRELS: 5 weeks

TAURUS PT92 / PT99: 5 weeks

WALTHER BARRELS:

  • P99: 5 weeks
  • PPQ: 5 weeks
  • PDP: 5 weeks
  • Q5 Match: 5 weeks
  • Q4 / Q5 Steel Frame: 5 weeks
  • PDP Steel Frame: 5 weeks

LEAD TIME FOR SERVICES & OTHER PRODUCTS

  • BERETTA 92 FIBER OPTIC FRONT SIGHT INSTALL: 4-5 weeks
  • BARREL THREADING: 3-5 weeks.
  • PVD/DLC COATINGS (CUSTOMER PROVIDED PARTS): 4-6 weeks
  • BERETTA 92 COMPENSATORS: 2-3 weeks
  • BERETTA 92 COMPENSATOR INSTALLS (BARREL THREADING AND COMP FITTING): 3-4 weeks